The Island Line Upgrade, Isle of Wight
Client: OSL Global
Case Study- the Isle of Wight railway line
The upgraded project involved the launch of a refurbished fleet of Class 484 trains and improvements to rail infrastructure, including creating level access from the train to the station platform.
During a 20-week blockade on the Island Line, MacRail provided site access controllers, induction management and control reporting, welfare, and temporary checks.
All the workers were recruited from the Isle of Wight, which helped our client OSL Global with win the CEEQUAL award for Sustainability*
*CEEQUAL is the international evidence-based sustainability assessment, rating and awards scheme for civil engineering, infrastructure, landscaping and works in public spaces.
A great service provided by MacRail who were always very adaptable and proactive. Also put effort into securing local resource for the SAC on site to assist the project in obtaining CEEQUAL Sustainability award.
The remote sign in facility has been a huge success.
Tom Hambly, Isle of Wight, OSL
Forming long-lasting relationships with all our customers, working together to build partnerships, empowering people to solve any industry challenge.